Re: Tech Levels in Excell Spreadsheet format...
I do.
I figured this out back in the day.
I have it written down, I'll post it on Tuesday.
They way I figured it out was this:
Start a game by yourself, and just go through the research tree.
With each level, it's a modified increase. A modified increase is straight increase X a percent. As you rise in the levels of a research topic, that percent is less and less.
Example:
Ship Construction level 1 := 10,000
Ship Construction level 2 := 20,000
Ship Construction level 3 := 45,000
Ship Construction level 4 := 80,000
So the third level is 20,000 X 2.25%
The fourth level is 45,000 X 1.7777%
Formula Current Project total/Previous Total
80,000/45,000 := 1.777777%
This is the pattern, so if you want you could just go through the research tree and figure out the percent each level increase.
Hope this helps.
Hope this helps.
|