Re: Somebody DEFINE the 50% refit rule please?!?
			 
             
			
		
		
		
		Okay alright, let me rephrase it: 
 
The TOTAL COST (mineral + organic + radioactive) of the new design must be within +/- 50% of the total cost of the current design. 
 
Now I need confirmation on the term "total cost". 
 
		
	
		
		
		
		
		
		
			
				__________________ 
				A propeller is just a big fan in front of the plane designed to keep the pilot cool. Want prove? Stop the prop and watch the pilot break out in a heavy sweat!
			 
		
		
		
		
		
		
	
		
		
	
	
	 |