Re: Date in long campaign
it is a long campaign game, "renaming it to a scenario" (I presume you mean copying it as a scenario file?)will not set the internal flags.
Dates are calculated internally in the LC code, determined by the delta of the number of battles you chose at the start. You chose 200, so the delta will be small. Also - dates will sometimes skip any periods of inactivity (France 40 to the desert say).
Cheers
Andy
|