| 
				 Re: construction sites 
 I think the hammer/forge bonus (Ulmish smith, etc.) is applied first and then the bonus from the site/FotA is applied. So, the 25% discount from the hammer brings it down to 7 gems and then a 20% discount is applied to that, bringing the final cost to 5 gems.
 I also remember reading that the minimum cost for an item is 1 gem.
 |