Quote:
Originally Posted by FASTBOAT TOUGH
I would reread Para. 5 of Post #560 again.
|
I did, why I pointed out the F/A-18C/D was not on the list the SDB is to be certified for. As to the existing use on the EF-35C Ferret (starting in 2018) it's not worth creating a new unit for a 2-year time period and YES the E/A-18G Growler could be extended till the end of 2020 and the the EF-35C Ferret incorporated, I may consider that.