
September 11th, 2002, 12:37 AM
|
 |
Major
|
|
Join Date: Aug 2002
Location: Western Canada
Posts: 1,226
Thanks: 0
Thanked 0 Times in 0 Posts
|
|
Re: Storage facilities
Quote:
Originally posted by Suicide Junkie:
I think Production and maintenance is subtracted from generation.
I know that retrofits are withdrawn straight from storage AFTER production/maintenace, AFTER the storage limits are applied, and BEFORE the generation.
|
I think you may wish to rephrase this, when you say:
a)production/maintenance is subtracted from generation (which implies generation comes first).
b) Retrofits are withdrawn ....AFTER production/maintenance and BEFORE the generation.
In any event, are you trying to say (in order of sequence):
1) new storage limits are increased (ie new storage facilities constructed)
2) retrofits are paid out of storage
3) the net of production/maintenance and production is added or subtracted to storage.
Just a bit confused... 
__________________
Know thyself.
Inscription at the Delphic Oracle.
Plutarch Morals
circa 650 B.C.
|