.com.unity Forums
  The Official e-Store of Shrapnel Games

This Month's Specials

Raging Tiger- Save $9.00
winSPMBT: Main Battle Tank- Save $5.00

   







Go Back   .com.unity Forums > The Camo Workshop > WinSPMBT > TO&Es
Notices


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old March 28th, 2008, 01:29 PM

thatguy96 thatguy96 is offline
Captain
 
Join Date: Jul 2005
Posts: 801
Thanks: 3
Thanked 21 Times in 20 Posts
thatguy96 is on a distinguished road
Default Re: Expeditionary Fire Support System

Alright, there is no IOC date in the GAO report. They were expecting a basic initial capability as of last July, and the design was reported as 95% finalized as of March of 2007 when the report was published.

The main issues then centered around getting the electronics to work (EFSS was supposed to fire within 30 seconds of recieving the command, with the average time in the report cited as closer to a minute) and the ITV. The ITV had its own issues, and ironically as of March 2007 the EFSS prime mover was the only variant not flight certified on the primary mission aircraft (CH-53E, MV-22, and C-130).

The FY07 budget also put $8 million into the ITV budget specifically for up-armoring. Two kits were going to be developed. An A kit designed to keep the vehicle within weight restrictions for airborne transportation, and a B kit designed to be readily installed after leaving an aircraft. The A kit adds 60 lbs of armor, while the B kit adds an additional 85 lbs (for a total of 145 lbs with both kits installed).
Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 01:44 AM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©1999 - 2025, Shrapnel Games, Inc. - All Rights Reserved.